The Recycler
  • https://keypointintelligence.com/communicationsupplies
  • Biuromax Masthead web banner March 2024
  • Katun Masthead Nov 2024
  • G&G Web Ad Dec 2024

Explosion at Konica Minolta’s toner plant

August 13, 2021

Only two days ago Konica Minolta announced it had resumed production at its Tatsuno factory after the fire investigation was concluded and safety measures were put in place.

Konica Minolta announced that around 5:15pm, 12 August, there was an explosion at the Tatsuno Factory of Konica Minolta Supplies Manufacturing Co., Ltd., a Konica Minolta Group company. The factory is located in Tatsuno, Nagano Prefecture.

The notice said: “We would like to give our sincerest apologies again to residents in neighbouring communities, relevant authorities and all those for the trouble. Below is the status as of 8pm, August 12. We will keep posting updates.”

Describing the events, the company said that there was sound of explosion around 5:15pm. Employees of the factory confirmed it was an explosion in the production line and immediately called the local fire department and police department, among others. At 6:36pm the fire department completed their on-site activities with confirmation.

Konica Minolta confirmed that there was no injury or casualty. One unit of production equipment on the second floor of the production building was damaged and the external wall of the third floor of the building was partially damaged.

The on-site inspection will be conducted on 14 August with the local fire department and police department.

Effects on production and shipment are being assessed.

The company added: “The Konica Minolta Group sincerely addresses the incident again and, in cooperation with the local fire department, police department and relevant authorities, will thoroughly investigate the cause.”

Categories : World Focus

Tags : Business Explosion Konica Minolta Production Toner

  • TN Core Dec 2024 Web Ad
  • Cartridge Web Web Ad Dec 24
  • Biuromax Nov 2024 Web Ad
  • IR Italiana Web ad January 2021
  • Static Control June 2022 Big & Bold Ad
  • Apex Web ad Nov 2024
  • G&G web advert October 2024
  • INk TANK Dec 24 Web Ad
  • Mito Web banner June 2024
  • Denner Feb 2024 Web Ad
  • HYB Web banner Jan 2024
  • PCL Nov Web advert
  • CET Web ad December 2023
  • Zhono Web ad March 2024
  • GM Technology Dec 24 Web Ad
  • denner UK Web Banner Jul 2024
  • PCL Nov Web advert
  • denner UK Web Banner Jul 2024
  • GM Technology Dec 24 Web Ad
  • Mito Web banner June 2024
  • Zhono Web ad March 2024
  • CET Web ad December 2023
  • Denner Feb 2024 Web Ad
  • HYB Web banner Jan 2024
  • CET Web ad December 2023
  • Denner Feb 2024 Web Ad
  • Zhono Web ad March 2024
  • GM Technology Dec 24 Web Ad
  • denner UK Web Banner Jul 2024
  • Mito Web banner June 2024
  • PCL Nov Web advert
  • HYB Web banner Jan 2024

The Recycler, Wittas House, Two Rivers, Station Lane, Witney, OX28 4BH, United Kingdom | Tel: +44 (0) 1993 899800 | Fax : +44 (0) 1993 226899
©2006-2023 The Recycler - Terms & Conditions - Privacy Policy including cookie use

Web design Dorset | Websites by Mark